Volume first, then bags or ready-mix, then 10% for waste - a worked 10x10 patio example, post-hole maths, and the point where a truck beats mixing by hand.
Order too little concrete and the truck leaves before the job is done — or worse, your slab sets in two pours with a cold joint between them. Order too much and you have paid for a cubic yard you will never use. The maths is simple once you know the shape you are filling: volume first, then bags or ready-mix, then a little extra for waste.
Every concrete job is one of three shapes. Measure in feet (or metres, if you prefer — just do not mix the two), and measure the depth in the same unit.
Depth is where most people go wrong: 4 inches is standard for a patio or path, 6 inches for a driveway or anything a car will sit on. Convert inches to feet by dividing by 12 — 4 inches is 0.333 feet, 6 inches is 0.5 feet.
Concrete is sold by the cubic yard, and there are 27 cubic feet in one cubic yard. So: multiply length × width × depth (in feet) to get cubic feet, then divide by 27.
Worked example — a 10 × 10 ft patio, 4 inches deep: 10 × 10 × 0.333 = 33.3 cubic feet. Divide by 27 and you get 1.23 cubic yards. That is the neat volume, before waste.
For a round post hole 12 inches wide and 2 feet deep: 3.14 × 0.5² × 2 = 1.57 cubic feet — about 0.06 cubic yards per hole, which is why post holes are a bag job, not a truck job.
Always add around 10% to the neat volume. Ground is never perfectly level, forms flex, and a little spills. Our patio example becomes 1.23 × 1.1 = 1.35 cubic yards to order.
Then the decision that saves money:
The concrete is only part of the job. A slab needs a compacted gravel base (typically 4 inches), formwork to hold the wet concrete at the right depth, and reinforcement — mesh or rebar — on anything bigger than a small path. None of that changes the volume, but forgetting it changes the day: a truck arriving to find no forms ready is an expensive lesson.
Also plan the finish: once poured, concrete needs about 24–48 hours before light foot traffic, about a week before you drive on it, and roughly 28 days to reach full strength. Keep it damp for the first few days if the weather is hot — concrete that dries too fast cracks.
Read your numbers back before you phone the supplier: length, width, depth, volume in cubic yards, plus the 10%. If you are between two sizes, round up — the cost of a little extra concrete is nothing against the cost of a second delivery, or a slab poured in two goes. And if the shape is awkward — an L-shape, a slope, a footing that steps — split it into rectangles, work each one out, and add them together.
Enter your slab, footing or post-hole measurements into the free Concrete Calculator and get cubic yards, bag counts by bag size, and the ready-mix threshold — with waste included.
Your page is published but nowhere on Google. Work through the six checks in order - indexing, real position, intent, competition, content, technical - and find the actual blocker.
Letter grades to grade points, weighted by credits - the exact method, a worked 3.5 GPA example, cumulative GPA done right, and how Honors and AP classes change the number.
Gmail stops at 25 MB and Outlook at 20 MB. Here is why PDFs balloon in size, how to compress one properly, and the split-and-merge fallback when compression is not enough.